Case Studies
May Gurney
Over the last 15 years Fibrelink has installed cat 5e/6 cabling and fibre optic cabling for May Gurney. Some have been in new offices and others in multiple porta cabins. Also, sites all over the country by railway stations, motorways and on top of bridges, but all with the same attention to detail. The philosophy is that a May Gurney employee should be able to fully function from any site.
Gas Transportation Company
The brief was to relocate GTC, a specialist gas and electric supplier to brand new premises with the minimum of disruption. Fibrelink designed, supplied and installed our voice and data solution. The latest phone system with voicemail, call monitoring and recording was connected to a fibre and cat 6 cabling infrastructure. The big move took place over one weekend which involved Fibrelink staff working shifts so that come Monday morning all 189 staff were fully functioning.
Madingley Hall
This was a major project which was extremely sensitive as Madingley Hall is a Grade I* listed building. We had already supplied and installed a phone sytstem which was set up to work as if in a hotel, with 60 rooms. The new brief was to provide a full security system that was as discreet as possible. This meant very careful planning with many meetings with senior university members, English Heritage, Building Conservation, Cambridgeshire Police and, most importantly, the Head Gardener, Richard. The project included door access control, driveway rising bollards, CCTV and IR beam detectors. All external equipment was painted in National Trust green and no cables were visible. In the region of 500m of ducting was installed across manicured lawns using specialist equipment with very little visual impact. Richard was very pleased with the result.

